EV Charging · Waco, Texas
Commercial EV Charging Stations in Waco, TX
Employees, fleet vans, and customers are starting to expect a place to plug in. We scope, permit, and build Level 2 charging for Central Texas businesses — and give you the honest math on DC fast charging before you chase it.
4.9 Google rating · 142+ reviewsLicensed & insured1-year labor warrantyUpfront pricing before work begins

Commercial Charging Projects We Build
Workplace charging for employees
A handful of Level 2 stations in the lot covers most workday needs. The design question is load management — sharing capacity across ports so you avoid an expensive service upgrade.
Fleet electrification
Vans and trucks that return to the yard every night are the best case for charging: predictable dwell time, predictable routes. We size circuits to the duty cycle instead of overbuilding.
Retail and hospitality sites
Customer-facing stations keep drivers on site longer. Placement, lighting, and bollard and signage circuits matter as much as the charging hardware, and they are all one electrical scope.
Multifamily and property managers
Tenants are asking, and shared-panel buildings make it complicated. Load management and metering strategy come before hardware — we scope both.
Site Realities in Central Texas
What we flag on commercial walk-throughs around the metro:
The I-35 corridor effect
Traffic between Dallas–Fort Worth and Austin passes through daily, and EV drivers plan stops around where they can plug in. Sites near the corridor have a real visitor case; sites deep in neighborhoods mostly serve their own people. Honest siting beats optimism.
Level 2 vs. DC fast-charge economics
DC fast charging needs heavy electrical service, utility coordination, and serious capital, and it mostly makes sense on high-traffic corridor sites. Most Waco businesses are better served by managed Level 2 — we will tell you which case you are.
Parking lot construction
Conduit has to cross drive lanes and landscaped islands, and Central Texas caliche does not trench politely. Routing is a real cost driver we measure on site, not from an aerial photo.
How the Job Works
Site assessment and load study
Existing service capacity, panel space, utility constraints, and where vehicles actually dwell — documented before any design.
Written proposal, approved before work
Station count, load management, conduit routes, permits, and schedule in one signed scope.
Permitted construction
Trenching, conduit, equipment pads, and wiring done to code, with inspections coordinated around your operating hours.
Commissioning and handoff
Every port tested under load, documentation delivered, staff walked through the equipment — backed by a 1-year labor warranty.
What Drives Commercial Charging Budgets
Hardware is a catalog item; the site is the variable. Three factors move a proposal, with financing available on qualifying projects:
Distance from electrical service to the stalls
Trenching across a parking lot, boring under drive lanes, and restoring pavement often outweigh the equipment itself.
Service capacity and load management
Spare capacity means simple circuits. A full service means either managed charging or a service upgrade — two very different numbers we present side by side.
Permit scope and utility coordination
City permitting is routine; utility-side work for larger sites adds lead time and cost that belong in the plan from day one.
You approve the price before any paid work starts. Diagnosis comes first, then written repair options — no surprise add-ons at the end of the visit. Financing options are available on qualifying projects →
What Waco Neighbors Say
4.9from 142+ Google reviewsRead all reviews →
“This guys are 5 stars all the way!! Great price, awesome customer service and fast/reliable. Had emergency water leak during cold storm, roads iced up. No other plumbing services could make it, but these guys came through and fixed me up.”
“Our sink was leaking, so Falcon 5 Plumbing responded to our AHS request for service. The response was almost immediate and our technician came out that day. Within a few hours, we had a new sink installed. He was very professional considerate, and did a great job.”
“Had a last minute emergency. Amazing response from the owner himself and came out to save the day. If you're looking for a true honest HVAC/plumbing company, give them a call.”
Related Services & Guides
More From This Service Line
Straight Answers, Before You Call
How many charging stations does my business actually need?
Fewer than the sales decks say, usually. Start from dwell time: employees parked eight hours can share slower circuits; a retail stop needs fewer, faster ports. We size from your parking behavior and give you a design that can grow instead of a guess that overbuilds.
Level 2 or DC fast charging for my site?
DC fast charging suits corridor traffic and quick-turn sites, and it demands heavy electrical service and real capital. Level 2 suits anywhere cars sit for an hour or more. Most local sites are Level 2 cases, and we will say so plainly if yours is.
Can our existing electrical service handle charging stations?
That is the first thing the load study answers. Many buildings have more headroom than owners expect, especially with load-managed stations that share capacity. If a service upgrade truly is required, you see that scope and price before committing to anything.
Who handles the permits and the utility?
We do. Commercial charging involves city permits and, on bigger sites, coordination with the utility on service capacity. That paperwork and lead time are managed inside the project schedule, not discovered halfway through.
Book a visit
Get a price you approve before work starts.
Call +1 (254) 717-0083 to talk it through, or send the request form and we confirm your window fast. Estimates are written, itemized, and yours to say yes or no to.
- Same-day appointments for active problems
- Upfront pricing — you approve before work starts
- Licensed & insured, 1-year labor warranty
- 4.9★ on Google from 142+ local reviews